Thu, Oct 22, 2026
National
Closure of solar power project puts Lomanthang in darkness
A solar power project operated at Lomanthang in Upper Mustang has closed down.bookmark
Published at : March 11, 2019
Updated at : March 11, 2019 08:17
THINI: A solar power project operated at Lomanthang in Upper Mustang has closed down. The plant with the capacity of generating 70 kilowatt electricity came to a halt after its battery failed to charge due to snowfall and cold. Ram Bahadur Gurung, a local, said the entire village has plunged into darkness following the shutdown of the station. The Chinese government had instaled the plant at the cost of Rs 10 million four years ago. “The locals are facing difficulties due to the plant’s shutdown”, said Gurung. (RSS)
Most Read from National
Flood sweeps away houses, bridges in Gorkha
What to know about the US trial over Mamta Kafle’s disappearance
Torrent of black mud and rocks engulfs settlements along Budhigandaki
From blankets to handmade dolls, two foreign women bring comfort to flood survivors
Budhi Gandaki flood washes away three bridges in Gorkha
Editor's Picks
E-PAPER | October 22, 2026
×




17.86°C Kathmandu













