Tue, Mar 3, 2026
Miscellaneous
Repair of bridge along East-West Highway starts
Repair of a concrete bridge in Butwal along the East-West Highway has started.bookmark
Published at : January 4, 2017
Updated at : January 4, 2017 15:17
Butwal (rupandehi)
Repair of a concrete bridge in Butwal along the East-West Highway has started.
The bridge over Tinau river in Butwal has been dilapidated with hundreds of potholes on the blacktopped surface and rods coming off.
Around 10,000 vehicles pass through the bridge on a daily basis. The repair has started by allowing one-way passage for vehicles and it is until the repair is complete, said the Road Division Office, Butwal.
Likewise, for vehicles heading to Butwal from east, a diversion road has been constructed.
Blacktopping the surface of the bridge is going on and repair of the bridge will be complete within five days, said the division office chief Megha Raj Marasini. The estimated cost of the project is approximately Rs 3.5 million. RSS
Editor's Picks
Five and half decades of KP Oli in Nepali politics
How Facebook’s algorithm is amplifying one party over all others
Nepal’s IT exports near $1 billion. Can the momentum be sustained?
Parties’ lofty pledges on economy collide with hard realities
Upper house passes tourism bill with tougher Everest rules
E-PAPER | March 03, 2026
×




9.89°C Kathmandu









