Tue, Sep 29, 2026
Karnali Province
Damaged Bangme suspension bridge left unrepaired
The residents of Ward 2 have no option but to wade through the river to reach the other wards.bookmark
Post Report
Published at : December 31, 2023
Updated at : December 31, 2023 19:19
Salyan
The 157-metre-long suspension bridge at Bangme in ward 2 of Bangad Kupinde Municipality, has been left unrepaired for 15 months after it was damaged by a landslide.
According to Man Bahadur Khatri, the chair of the ward, the bridge over the Bheri River connects four villages of the ward and was damaged in October 2022. The residents of Ward 2 have no option but to wade through the river to reach the other wards.
“Previously, a budget was allocated for repairing the bridge, but the work could not start due to some paperwork issues. We are working towards starting the repair work as soon as possible,” said Khatri.
Most Read from Karnali Province
Editor's Picks
What triggered the Rasuwa flood? Scientists piece together a complex chain of events
The floods keep coming. Nepal keeps starting over
In a settlement destroyed by the Bhotekoshi flood, a disabled couple offer strangers the little they have
Nepal working on detailed assessment as Bhotekoshi flood reconstruction could cost up to $5 billion
Rabindra Dhant gave Nepal a reason to smile. Now his camp wants real action behind the praise
E-PAPER | September 29, 2026
×




21.43°C Kathmandu











