Sun, Dec 14, 2025
Videos
Siddhababa tunnel achieves breakthrough
Even if the contractor, China State Construction Engineering Corporation, sticks to the timeline, the tunnel will take over a year before vehicles can operate.Editor's Picks
Public savings at risk as debt-ridden Nepal Airlines’ finances spiral
Hypertension and diabetes driving eye crisis in Kathmandu Valley
Bureaucratic hurdles, legal failures force father and daughter to take their own lives
Record graft case filed over China-funded Pokhara airport
Drone helps farmers tackle old challenges
E-PAPER | December 14, 2025
×




13.12°C Kathmandu






