Thu, Oct 15, 2026
National
Landslide blocks Araniko Highway at 50 kilometre mark, causing traffic disruption
Blockage has caused a heavy traffic jam, with hundreds of vehicles stranded on both sides of the highway.bookmark
Post Report
Published at : October 13, 2024
Updated at : October 13, 2024 10:24
Kavre
A dry landslide has completely blocked the Araniko Highway at the 50-kilometre mark in Panchkhal Municipality-8, disrupting traffic flow. The landslide occurred around 9 PM on Saturday night, according to Inspector Bikas Tamang, Chief of the District Traffic Police Office in Kavre.
Efforts are currently underway to clear the debris and reopen the highway, which has remained obstructed since the night of the incident. The blockage has caused a heavy traffic jam, with hundreds of vehicles stranded on both sides of the highway.
The police and the locals are working to restore traffic as soon as possible, but no estimate has yet been provided for when the road will be fully operational.
Most Read from National
Flood sweeps away houses, bridges in Gorkha
Torrent of black mud and rocks engulfs settlements along Budhigandaki
From blankets to handmade dolls, two foreign women bring comfort to flood survivors
Budhi Gandaki flood washes away three bridges in Gorkha
British Gurkha veterans issue ultimatum to Nepal government over long-standing grievances
Editor's Picks
Constitutional Bench caught in seniority, ‘pick and choose’ dispute
A Dom boy’s long road to becoming a doctor
From blankets to handmade dolls, two foreign women bring comfort to flood survivors
News Analysis: When institutional defence exposes institutional fault lines
It’s a bird … it’s a plane … it’s the Indian ambassador’s farewell tweets
E-PAPER | October 15, 2026
×




16.18°C Kathmandu













