• National
  • Politics
  • Valley
  • Opinion
  • Money
  • Sports
  • Culture & Lifestyle

  • National
    • Madhesh Province
    • Lumbini Province
    • Bagmati Province
    • National Security
    • Koshi Province
    • Gandaki Province
    • Karnali Province
    • Sudurpaschim Province
  • Politics
  • Valley
    • Kathmandu
    • Lalitpur
    • Bhaktapur
  • Opinion
    • Columns
    • As it is
    • Letters
    • Editorial
    • Cartoon
  • Money
  • Sports
    • Cricket
    • Football
    • International Sports
  • Culture & Lifestyle
    • Arts
    • Brunch with the Post
    • Movies
    • Life & Style
    • Theater
    • Entertainment
    • Books
    • Fashion
  • Health
  • Food
    • Recipes
  • Travel
  • Investigations
  • Climate & Environment
  • World
  • Science & Technology
  • Interviews
  • Visual Stories
  • Crosswords & Sudoku
  • Horoscope
  • Forex
  • Corrections
  • Letters to the Editor
  • Today's ePaper
Wednesday, July 30, 2025

Without Fear or FavourUNWIND IN STYLE

28.41°C Kathmandu
Air Quality in Kathmandu: 71
300+Hazardous
0-50Good
51-100Moderate
101-150Unhealty for Sensitive Groups
151-200Unhealthy
201-300Very Unhealthy
Wed, Jul 30, 2025
28.41°C Kathmandu
Air Quality in Kathmandu: 71
  • What's News :

  • Nepal’s plan to lower marriage age
  • Nepal’s export boom
  • Nepal-India boundary works
  • Maternal deaths in Nepal
  • Division in Maoist Centre

Bagmati Province

Travellers along BP Highway’s new track face a gruelling journey

The hastily built track is narrow, dusty, and full of potholes, and causes long traffic jams. Travellers along BP Highway’s new track face a gruelling journey
Vehicles negotiating a rough detour around a landslide damaged section of the BP Highway. Post File Photo
bookmark
  • facebook
  • twitter
  • Whatsapp
  • mail
Jyoti Shrestha
Published at : October 18, 2024
Updated at : October 18, 2024 07:24
Kavre

A new track has been constructed to resume transportation along the BP Highway, which was ravaged by floods and landslides in September last week. Vehicular movement has now come into operation through the new track two weeks after the devastating floods and landslides.

The recently opened track, however, is not without its downsides. “I thought that I could reach Kathmandu in around five-six hours,” said Arjun Karki, who was heading to Kathmandu from Okhaldhunga on Wednesday. “But it seems that it is not possible to reach the national capital even within 10 years,” Karki added, sarcastically.

The devastating floods and landslides had swept away around 10 kilometre-long road from Bhakundebesi to Nepalthok on September 27-28. The road was washed away in some places and was severely damaged in others.

Keeping in view the people visiting home during Dashain festival, the new track was opened through the damaged road section. The hastily constructed track is narrow, quite rough, dusty and full of potholes, causing hour-long traffic jams. The vehicles have to wade through the streams while passengers have to get off the vehicles in some places along the road stretch.

“I set off for Kathmandu as I heard that the highway [BP Highway] was opened but the travel is quite risky and time consuming,” said Karki, who the Post reporter met at Narke of Roshi Rural Municipality-9 on Wednesday. Karki added that it is not possible to take patients to the health institutions timely through the highway anytime soon.

Another passenger, Rustam Lama, who was heading to Kathmandu from Dhanusha, shares a similar ordeal. “Even the light vehicles struggle to navigate the steep dirt track,” he said. “Passengers are asked to get off and push the vehicles. We got off the vehicle in two places. I chose to travel through this highway thinking that it is the shortest route to reach Kathmandu from eastern Tarai. But I was wrong and I learned it the hard way.”

Meanwhile, Prakash Tamang, who was on his way to Kathmandu from Ramechhap on a motorcycle, was covered in dust. “I decided to use the highway upon knowing that a new track was opened but it was a mistake,” Tamang said. “The track is not good for two wheelers.”

But the track is not good for four-wheelers either, as reports Bhim Bahadur Sunuwar, who was driving a passenger jeep en route to Phikkal of Sindhuli from Kathmandu. “We are caught in jams for hours,” Sunuwar said. “The track is quite accident prone as well.”

The Kavre section of BP Highway was badly damaged in Mamtikhola, Kaldhunga, Boksikuna, Narkepul, Pinathalibesi, Dalabesi, Bhyakurekhola, and Mangaltar, among other places. The roads were swept away in these areas. According to the Road Division Office in Bhaktapur, diversions have been constructed in the affected area to resume transportation along the highway. It is suspected that it will take months, if not years, to reconstruct the disaster-ravaged highway to its previous condition.

Kavre is the worst hit district by the floods and landslides that struck various parts of the country in the last week of September. A total of 78 people were killed in Kavre alone while the rain-induced disasters ruined various infrastructures including houses, roads, drinking water projects, and utility poles. The most affected areas in the district include Panauti Municipality, Bethanchowk Rural Municipality, Temal Rural Municipality and Mandandeupur Municipality, with the highest number of casualties reported in Panauti.

Preliminary data shows that around 3,000 to 3,500 houses were completely destroyed while 6,000 to 7,000 others were partially damaged by the disasters in the district. According to the District Administration Office in Kavre, the government authorities and non-governmental organisations have distributed shelter kits, tarpaulins and food items to the displaced families.


Jyoti Shrestha

Jyoti Shrestha is the Kavre correspondent for Kantipur Publications.


Related News

Bagmati Chief Minister Lama appoints three ministers amid deepening intra-party rift
Bhotekoshi flood blocks Syaphrubesi–Rasuwagadhi road again
Flood in Bhotekoshi river prompts alert for low-lying areas
Chief Minister Lama loses party leadership in Bagmati power struggle
Former Gandaki Province chief Prithviman Gurung passes away
Congress rift deepens in Bagmati as four ministers quit

Most Read from Bagmati Province

Unregulated quarrying fuels fear in flood-ravaged Bethanchok
Chief Minister Lama loses party leadership in Bagmati power struggle
Indian pilgrim hacked to death in Sindhuli temple dispute
Congress rift deepens in Bagmati as four ministers quit
Bhotekoshi flood blocks Syaphrubesi–Rasuwagadhi road again

Editor's Picks

Kailash pilgrims breathe new life into Nepal’s mountain economy
Pressure groups are dictating lawmaking
Indians paying by QR in Nepal for a year but Nepalis still lack access in India
UML weighs binning age, term limits amid Oli-Bhandari rivalry
Law in the works to check officials’ conflict of interest

E-PAPER | July 30, 2025

  • Read ePaper Online
×
ABOUT US
  • About the Post
  • Masthead
  • Editorial Standards & Integrity
  • Workplace Harassment Policy
  • Privacy Policy
READ US
  • Home Delivery
  • ePaper
CONTACT US
  • Write for the Post
  • Letters to the Editor
  • Advertise in the Post
  • Work for the Post
  • Send us a tip
INTERACT WITH US
  • Twitter
  • Facebook
  • Instagram
OUR SISTER PUBLICATIONS
  • eKantipur
  • saptahik
  • Nepal
  • Nari
  • Radio Kantipur
  • Kantipur TV
© 2025 www.kathmandupost.com
  • Privacy Policy
Top